+8613702855825

Notes For Shelf Installation

Oct 09, 2020

1, shelf general installation and acceptance, to ensure the quality and safety, promote technical progress, improve economic benefits, the formulation of this code.

2. Shelf installation shall be carried out according to the drawing. In case of any discrepancy in site or design found during construction, it shall be raised in time and construction shall be carried out only after approval of change.

3. All kinds of measuring and testing instruments, instruments, meters and equipment used in the installation of shelves shall comply with the provisions of the current national measurement laws and regulations, and their accuracy level shall not be lower than the accuracy level required for installation.

4. The concealed works before the installation of the shelves shall be inspected before the concealed works are carried out, and the construction can continue after passing the inspection.

5. Self-inspection should be carried out in the installation of shelves.

6. Shelf installation and construction shall comply with the current national (industrial) standards and specifications, in addition to the implementation of this code.


Send Inquiry